[Example] Continuously cooling the data center
Designed with the improvement of cooling water performance and continuous availability in mind! A case study achieving facility upgrades with zero downtime.
We would like to introduce a case where a system designed with a focus on improving the performance of cooling water and continuous availability was implemented at a data center in the United States. A major data center handling millions of retail transactions had to upgrade its cooling system during the shopping season, necessitating a temporary temperature control system. Our engineers teamed up with cooling tower specialists to design a 1,600-ton temporary cooling system to meet the customer's needs and increased load. During a two-week period, our temporary cooling system maintained the appropriate temperature for the data center. [Case Summary] ■ Challenge: Continue operating the data center in optimal condition during peak shopping season ■ Solution: Chillers and cooling towers designed for maximum availability ■ Result: Facility upgrade, zero downtime, numerous satisfied customers *For more details, please download the PDF or feel free to contact us.
- Company:Aggreko Japan
- Price:Other
![[Example] Continuously cooling the data center](https://image.mono.ipros.com/public/product/image/38f/2001525415/IPROS18075491232561190005.png?w=280&h=280)